How should residential architecture plans set floor elevations before excavation begins?
One benchmark controls every footing, threshold, utility connection, and finished floor that follows. Do not release excavation until the drawings connect that recoverable benchmark to a signed elevation schedule and defined field hold points. Residential architecture plans must start from one recoverable vertical datum Residential architecture plans must anchor every vertical dimension to one recoverable…
